I can see the wire break in the cable chain :'(

  • IMALlama@lemmy.worldOP
    link
    fedilink
    English
    arrow-up
    1
    ·
    2 months ago

    I had no idea about cable chain slack when building :( I wouldn’t call the wires tight, but they’re not super duper loose either.

    I work in automotive and have a bit too much experience with CAN. It is appealing to have fewer wires in the chains, but so far wire breaks have been super easy to find/fix. I’m somewhat tempted to give chains with discreet wires another go. It shouldn’t take more than 4-5 hours to have a cut and crimped to lenth harness installed.

    I am tempted to start researching a BOM for USB + top hat though.

    • morbidcactus@lemmy.ca
      link
      fedilink
      English
      arrow-up
      1
      ·
      2 months ago

      Last time I used can was for battery controllers on one tool family back in pipelining, people kept losing or forgetting the terminators.

      There’s the nighthawk toolhead for Stealthburners that’s one of those usb umbilical boards, and did look at this printable tophat in the past.

      I definitely ran spares in my cable chain as the less I need to open them the better, if I did discreet wiring on a new build though I very much might consider running something like a multi conductor cable through the cable chains with a smaller one for power+ground, build in some allowances for spares just to be safe.