They’re not merely replacing floppies, swapping in some emulators to take over. They’re attempting to redesign and future-proof the entire system. That kind of a big deal. Oh, and it all has to run flawlessly during the transition period.
No, the $212 million includes the entire upgrade (and 20 years of support) of the automatic train control system. The full $700 million plus is for the overall modernization of multiple systems.
Not disputing what you said — just clarifying that other upgrades are not part of the $212 mil and what is meant by “whole system”. The $212 is just to replace the floppy based system with something newer that includes a service contract.
“Beyond the floppies, though, the Muni Metro needs many more upgrades. The SFMTA plans to spend $700 million (including the $212 million Hitachi contract) to overhaul the light rail’s control system. This includes replacing the loop cable system for sending data across the servers and trains. The cables are said to be a more pressing concern than the use of floppy disks. “
Supposedly the new system is five gens ahead of the old system and would have additional features. Some would say “if it ain’t broke don’t fix it” but whatever. I’m sure it will be as fancy as upgrading to Windows 11 at that price.
They’re not merely replacing floppies, swapping in some emulators to take over. They’re attempting to redesign and future-proof the entire system. That kind of a big deal. Oh, and it all has to run flawlessly during the transition period.
This ain’t your homelab boys.
According to the article, the other improvements are priced separately from the $212 million de-floppy-ing.
And that cost includes decades of support.
No, the $212 million includes the entire upgrade (and 20 years of support) of the automatic train control system. The full $700 million plus is for the overall modernization of multiple systems.
Not disputing what you said — just clarifying that other upgrades are not part of the $212 mil and what is meant by “whole system”. The $212 is just to replace the floppy based system with something newer that includes a service contract.
“Beyond the floppies, though, the Muni Metro needs many more upgrades. The SFMTA plans to spend $700 million (including the $212 million Hitachi contract) to overhaul the light rail’s control system. This includes replacing the loop cable system for sending data across the servers and trains. The cables are said to be a more pressing concern than the use of floppy disks. “
Supposedly the new system is five gens ahead of the old system and would have additional features. Some would say “if it ain’t broke don’t fix it” but whatever. I’m sure it will be as fancy as upgrading to Windows 11 at that price.